Hawks & Company

(856) 845-7311

  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
  • Home
  • About Us
    • Core Values
    • History
    • Safety
    • Certifications
    • Our Team
    • Blog
  • Services
    • Service and Maintenance
    • Energy Services
    • Retrofit & Design Build
    • Refrigeration
  • Industries Served
    • Senior Living
    • Healthcare
    • Commercial Real Estate
    • Industrial
    • Manufacturing
    • Mission Critical
  • Legionella
  • Insight
  • Case Studies
  • Careers
    • Training
    • Open Opportunities
    • Inquire Now
  • Contact
  • Home
  • About Us
    • Core Values
    • History
    • Safety
    • Certifications
    • Our Team
    • Blog
  • Services
    • Service and Maintenance
    • Energy Services
    • Retrofit & Design Build
    • Refrigeration
  • Industries Served
    • Senior Living
    • Healthcare
    • Commercial Real Estate
    • Industrial
    • Manufacturing
    • Mission Critical
  • Legionella
  • Insight
  • Case Studies
  • Careers
    • Training
    • Open Opportunities
    • Inquire Now
  • Contact

January 4, 2016 By Hawks and Co.

Special Projects

Warehouse expansion, South Jersey

Challenge: Inconsistent temperatures in the space along with an ineffective and inefficient hydronic hot water heating system, resulting occupant discomfort and reduced productivity

Solution: Hawks & Company performed a design-build project for a 60,000 square foot expansion and existing 40,000 square foot warehouse. Hawks installed 3 Johnson Air Rotation gas fired heating units along with an integrated warehouse and garage exhaust system.

Results: The client now experiences minimal temperature difference from floor to ceiling and a resultant increase in occupant comfort and productivity, as well as the benefit of a more efficient heating system. By performing a value-engineered project, the client now can benefit from a complete upgrade of the mechanical infrastructure along with a $20,000 a year in gas savings.

By earning the client’s trust through this job, Hawks was asked to provide a design-build solution for their corporate office space, requiring the retrofit of an existing 40-ton rooftop unit redesigned to a 20-ton rooftop unit. This job resulted in an energy savings of over 40% on the client’s utility bill.

Filed Under: Case Studies

Partners with:

lanj logo

Leading Age New Jersey Preferred vendor New Jersey HVAC

footer logos HCANJ

footer logos HCANJ

Footer logos GCC

Footer logos GCC

CCSNJ

CCSNJ

Mitsubishi Diamond Commercial Contractor

Mitsubishi Diamond Commercial Contractor
  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
  • Home
  • About Us
  • Services
  • Industries Served
  • Insight
  • Case Studies
  • Careers
  • Contact
  • Privacy Policy
  • Sitemap